![drake leaks views from the 6 zip drake leaks views from the 6 zip](https://www.si.com/.image/t_share/MTgxNDg3ODA4Njg5NDgwODcy/usatsi_16113610_168388303_lowres.jpg)
Its unclear if it was intended or not, although its being removed from the sites hosting and sharing MP3 copies. 31.Įditor's note: This story has been updated to reflect NASA's new intended launch date for SLS.Beyonce will make it to the final track list as the track both leaked and then got premiered on radio earlier this year.ĭrake Meek Mill both released new diss tracks today, Drake dropped Summer Sixteen which is the lead single for this album, and Meek Mill released War Pain which was the outro of his latest EP. Assuming SLS does have to be sent back to the shop, the next likely launch window for Artemis 1 will run from Oct. The current projected launch date for Artemis is now Sept. Whether Artemis 1 remains on the launch pad or must be returned to the VAB, NASA Administrator Bill Nelson reminded the world last week that “the cost of scrubs is a lot less than failure.” And that claim is certainly beyond dispute. "Teams may return the rocket to the Vehicle Assembly Building (VAB) to perform additional work that does not require use of the cryogenic facilities available only at the pad." "Performing the work at the pad also allows teams to gather as much data as possible to understand the cause of the issue," they added. "Performing the work at the pad requires technicians to set up an enclosure around the work area to protect the hardware from the weather and other environmental conditions, but enables engineers to test the repair under cryogenic, or supercold, conditions," officials wrote in Tuesday’s update. But whether or not the rocket will ultimately have to go back to the garage remains uncertain.
#Drake leaks views from the 6 zip update
The Artemis 1 launch team recently decided to replace the seal on the misbehaving interface, according to a NASA update on Tuesday, Sept. The exact cause of the leak is unclear, but it has been traced back to the “quick disconnect” interface that connects the SLS core stage to the propellant line of the rocket's mobile launch tower. (Hydrogen is the smallest atom, so it wants to escape closed systems with alacrity, especially in liquid form.) Ultimately, when the leak persisted, the launch control team scrubbed their second attempt to shoot for the Moon. Engineers were forced to modify their procedures to try to get the leak to self-seal. 3, NASA’s next-gen Space Launch System (SLS) encountered a new and “large” leak that presented a fire hazard, agency officials said in a press conference. While loading the rocket’s supercooled liquid hydrogen fuel on Saturday, Sept. Artemis 1’s planned launch was delayed until the weekend - but things didn’t improve.
![drake leaks views from the 6 zip drake leaks views from the 6 zip](https://img0.etsystatic.com/101/0/12631345/il_fullxfull.972131680_ntci.jpg)
The main showstopper, however, was one of the rocket’s four core-stage engines apparently not cooling to the temperature required for blast off.Īlthough that temperature reading might have been due to a sensor error, even if all the other issues had been resolved last week, there were still weather complications that would have likely stalled any attempt to take flight. That day, NASA managers briefed the press, citing several glitches, including a tetchy hydrogen leak, a lightning strike that delayed fuel loading, and a valve problem. The first launch attempt for NASA’s Artemis 1 mission on Monday, Aug.